A sprinkler or valve belongs within a complete engineered installation. A suppression enquiry starts with the building, the materials or equipment involved and the required protection objective.
Describe the hazard
Provide the building use, stored materials or protected equipment, layout and expected changes. Storage conditions and the activity in the space influence the design questions.
Review the infrastructure
Water supply, pipework, pumps, valves or agent storage may all matter. The responsible design team needs information about the infrastructure, the installation constraints and access for future servicing.
Match products to the application
Different sprinkler families and system components have defined performance and approval conditions. Selection needs to follow the design basis and the manufacturer’s technical information.
Identify the delivery route
Establish the specialist design and installation responsibilities, approvals, inspections and commissioning evidence required. Include relevant insurer or client requirements early.
Plan the working life
Access for inspection, test arrangements, maintenance and changes to the protected space should be considered before handover. A change in storage or use may require review of the original design.
Your planning checklist.
- Building and hazard information
- Protection objective
- Water or agent infrastructure
- Design and approval responsibilities
- Installation and commissioning
- Inspection and maintenance access